A total of 82 sub-structure units were inspected, consisting of a 100% visual inspection and 10% cleaning. In addition, ultrasonic thickness measurements were taken at intermittent locations for each sub-structure unit. The inspections were conducted as part of the Biennial Bridge Inspection Program. The project also involved the hydrographic surveys of the waterway surrounding the bridge.