This structure carries an average of 70,000 ADT in an east-west direction over the Hudson River between Albany and Rensselaer Counties, with 84,000 vehicles using the I-90 and I-787 Interchange on a daily basis. The project was part of the Department’s Accelerated Bridge Construction Program, requiring the contractor to mitigate the disturbance of traffic during construction. Boswell Engineering as the prime consultant.
ACEC Nationwide Recognition Award Winner as well as ACECNJ Honor Award for Large Projects.