This work consisted of roadway reconstruction, replacing three bridge superstructures, bridge widening over Turnpike ramp “TW,” construction of a new bridge, utility relocation, paving, overhead sign structures, drainage, roadway lighting, traffic signals, concrete barrier curb, retaining walls, sheeting and drilled shafts.