Client

Borough of Hawthorne

Location

Hawthorne, NJ

Completion Date

2024

Markets

Water

Division

Engineering

Discipline

Construction Management, Environmental Sciences, Municipal, Site/Civil, Structural Engineering, Water / Wastewater / Stormwater

Boswell conducted soil sampling due to previous lead contamination at the tank site.

All contaminated soil was excavated and sampled for waste characterization before off-site transport to a regulated facility. The site was backfilled with certified clean fill and compact so that the site conditions were equal to or exceeding pre-excavation conditions. Services also included construction inspection and administration.