Wastewater Conveyance System Force Main

NBMUA
NBMUA
previous arrow
next arrow

Project information

  • Location: Township of North Bergen/City of Jersey City, New Jersey

  • Client: North Bergen Municipal Utilities Authority
  • Disciplines: Design, Construction Administration, Regulatory Permitting/Compliance

In order to transport wastewater from North Bergen’s Central Treatment Plant to the Northwest Interceptor in Jersey City, a 30-inch force main was installed parallel to the New York Susquehanna & Western Railroad (NYS&W). The 30-inch high density polyethylene pipe (HDPE) was located on the western side of the NYS&W and crossed beneath several sets of railroad sidings and ditches/swales.

The sanitary force main located along the eastern boundary of the Hackensack Meadowlands District (HMD), extended approximately 3.89 miles (North Bergen to Jersey City). This wastewater line carried approximately eight (8) million gallons of sewage per day to the 54-inch Interceptor line in Jersey City. Although the effluent was originally treated at the Central Treatment Plant, Boswell demonstrated a significant annual cost savings associated with the construction of the force main and elimination of this plant.

The force main was installed along an existing railroad, which transected several highly industrialized urban areas. This portion of North Bergen marked the eastern boundary line of the HMD, which contained one of the largest contiguous blocks of open space in the highly developed surrounding area. The construction phase activities required the disturbance of tidal freshwater wetland systems and regulated tributaries at various locations. These emergent wetlands act as a buffer area to the more critically sensitive habitats within the Meadowlands to the west.

The $18 Million project required coordination with all applicable environmental regulatory agencies throughout the design/build process to ensure the timely completion of the sanitary force main. Boswell’s Environmental Division was responsible for the delineation of all wetlands and the acquisition of local, State and Federal permits and approvals; i.e., ACOE Individual Permit, NJMC Zoning Certificate, NJDEP Waterfront Development and negotiations with the ACOE Mitigation Unit. A primary concern involved an existing wetland system which had been previously selected for mitigation as a wetland enhancement area. Boswell worked closely with the ACOE to ensure this area would remain a viable mitigation site following installation of the force main.

Related projects

Wanaque Valley Regional Sewerage Authority Capital Improvement Project

Fort Lee Sewer Overflow Discharge Characterization Study

Oradell Sanitary Sewer Improvements (Phase 1-4)

Hackensack Redevelopment Area (HRA) Storm Sewer Separation Project – Phase 1

NJEIT Infrastructure Improvements (North Bergen)

Lower Main Pumping Station Improvements