thumbnails
Chelsea Pier 61 Substructure Investigation
Condition Survey of Berth Nos. 68 through 86
Evaluation of Supplemental Relief Outfall & Multi-Port Diffuser Structures
Emergency Repair Design Piers C and D
Immediate Action Condition Survey Inspections of Various Waterfront Structures
The Port Authority of NY & NJ – Materials Engineering Division
James A. Fitzpatrick Nuclear Power Plant – Fish Deterrent System
NYSDOT- Bridge Diving Inspections & Fathometer Surveys
John F. Kennedy Airport Runway 4-22 and 7-25 ILS Piers
Department of Transportation Underwater Bridge Inspections
Delaware River Port Authority Bridge Evaluations
Chelsea Pier 61 Substructure Investigation
Chelsea Pier 61 Substructure Investigation
Condition Survey of Berth Nos. 68 through 86
Condition Survey of Berth Nos. 68 through 86
Evaluation of multi-port Structures
Emergency Repair Design Piers C and D
Emergency Repair Design Piers C and D
Immediate Inspections of Waterfront Structures
Immediate Inspections of Waterfront Structures
The Port Authority of NY & NJ
The Port Authority of NY & NJ
Fish Deterrent System
Bridge Diving Inspections
Bridge Diving Inspections
John F. Kennedy Airport Runway
John F. Kennedy Airport Runway
Department of Transportation Underwater
Delaware River Port Authority Bridge Evaluations