New Mestre Hospital

New Mestre Hospital 1
New Mestre Hospital 2
New Mestre Hospital 3
New Mestre Hospital 4
New Mestre Hospital 5
New Mestre Hospital 6
New Mestre Hospital 7
previous arrow
next arrow

Project information

Services:
Concept Design
Detailed Design
Construction Documents
Location:
Mestre, Venice
Country:
Italy
Client:
Veneta Sanitaria s.c.a.r.l., Italy
Completion date:
2008

The hospital’s main building is composed of a technological platform
area and an in-patient room block. This main block contains a three
floor platform area, and seven floors built above ground level, five of
which are used to accommodate hospitalized patients.
The platform area consists of a reinforced concrete construction; the
single “residential” block construction on top is a mix of steel and
concrete.

The platform area performs the hospital’s key functions, housing the
technological areas (basement), operating theatres and diagnosis
and treatment areas (ground floor) and visitor’s area (first floor).
The area used as patient rooms occupies six floors, starting with the
technological structure, and is chiefly used for wards accommodating
patients receiving routine treatment.
Charateristics: 84,980 sqm; beds: 680 + 25 dialysis + 20 cribs.