North Temple-Northkill 69kV 835 Line Rebuild
Project Information
• Rebuild of the 69kV 835 Line between the North Temple and Northkill substations.
• Wood and steel pole structures utilized, static replaced with OPGW.
• Multiple wire pulls over railroads and state highways.
• Relay upgrades constructed at the terminals ends at both substations.