New Jersey Environmental Infrastructure Trust Water System Improvements (East Orange Water Commission)

eowc

Location: East Orange, NJ
Scope of Services: Design, Construction Administration, Permitting
Client: East Orange Water Commission

The services provided by Boswell Engineering included planning and design of three (3) phases of water system improvements, including 115 miles of water main leak detection, exercising program for 2,150 valves and the replacement of over 4,500 linear feet of water main throughout the City of East Orange. The water main replacements replaced undersized lines throughout the City and to increased fire flow protection. The professional services also included construction inspection and administration. Boswell was responsible for preparation of the planning document, loan application and administration of the loan throughout the construction phase.

Services also included construction inspection and administration.  The project was funded through the New Jersey Environmental Infrastructure Trust fund with 25% principal forgiveness.